Volume 2F Appendix P: Part 1 Contamination

Volume 2F Appendix P: Part 1 Contamination (pdf)

Contents Pages
Glossary of terms and abbreviations ii
Executive summary iv
1 Introduction 1-1
1.1 Overview of the project 1-1
1.2 Project location 1-1
1.3 Secretary’s environmental assessment requirements 1-4
1.4 Purpose of this report 1-5
1.5 Structure of this report 1-6
2 Proposed project 2-1
2.1 Project features 2-1
2.2 Construction activities 2-2
2.3 Specific aspects relating to contamination 2-6
3 Assessment methodology 3-1
3.2 Limitations 3-6
3.3 Methodology 3-6
4 Existing environment 4-1
4.1 Section 1 – Homebush Bay Drive to Pomeroy Street 4-1
4.2 Section 2 – Pomeroy Street to Ismay Avenue 4-14
4.3 Section 3 – Ismay Avenue to Carrington Lane 4-19
4.4 Section 4 – Carrington Lane to Broughton Street 4-27
4.5 Section 5 – Broughton Street to Iron Cove Creek (continues in part 2) 4-37
Advertisements

Volume 2F Appendix P: Part 2 Contamination

Volume 2F Appendix P: Part 2 Contamination (pdf)

Contents Pages
4.5 Section 5 – Broughton Street to Iron Cove Creek (continued from part 1) 4-38
4.6 Section 6 – Iron Cove Creek to Bland Street (including Wattle Street) 4-49
4.7 Section 7 – Bland Street to Orpington Street 4-60
5 Assessment of construction impacts 5-1
5.1 Contamination impacts 5-1
5.2 Acid sulfate soil impacts 5-7
6 Assessment of operational impacts 6-1
7 Management of impacts 7-1
8 Conclusion 8-1
9 Limitations 9-1
10 References 10-1
Appendix A – Historical aerial photographs A
Appendix B – Historical title deeds (continues in part 3) B